Projects

  • Cottonwood Connections

    Cottonwood Heights, Utah

    See The Project
  • TSMC Phase 4 Auxiliary Buildings

    Phoenix, Arizona

    See The Project
  • Texas Instruments Semiconductor Fabrication Plant (LFAB2)

    Lehi, Utah

    See The Project
  • Aligned Data Center Campus, Project Phoenix

    Shippingport, Pennsylvania

    See The Project
  • Aligned/Meta Data Center

    West Jordan, Utah

    See The Project
  • CloudHQ Manassas Data Center (MDC) Campus

    Manassas, Virginia

    See The Project
  • QTS SLC1 Data Center

    Eagle Mountain, Utah

    See The Project
  • Austin-Bergstrom International Airport Expansion and Development Program

    Austin, Texas

    See The Project
  • Hollywood Burbank Airport Replacement Terminal Project

    Burbank, California

    See The Project
  • Salt Lake City International Airport Terminal Replacement Project

    Salt Lake City, Utah

    See The Project

Salt Lake City International Airport Terminal Replacement Project

Salt Lake City, Utah (2017 - 2026)

Since 2017, OCI has been providing the General Contractor, a joint venture between Holder Construction and Big-D Construction known as HDJV, with quality control consulting services for the new SLC TRP project.

Hollywood Burbank Airport Replacement Terminal Project

Burbank, California (2024 - 2026)

In 2024, OCI began providing the General Contractor, a joint venture between Holder Construction, Pankow Builders, and TEC (known as HPTJV) with quality control consulting services during the reconstruction of the Hollywood Burbank Airport (BUR).

Austin-Bergstrom International Airport Expansion and Development Program

Austin, Texas (2026 - Present)

Journey With AUS is Austin-Bergstrom International Airport’s multi-year expansion, development and improvement program.

QTS SLC1 Data Center

Eagle Mountain, Utah, (2025 to Present)

Quality Technology Services (QTS) is investing more than $6B into the SLC-1 campus that will eventually span 193 acres and create at least 5 data center structures. 

CloudHQ Manassas Data Center (MDC) Campus

Manassas, Virginia, (2026 to Present)

In early 2026, Holder Construction (Holder) tapped OCI to assist them with their quality program on the MDC Campus for CloudHQ. The program consists of 3 separate 84-MW structures with on-site power substations.

Aligned/Meta Data Center

West Jordan, Utah, (2024 to 2025)

In 2024, OCI partnered with Performance Contracting, Inc. (PCI) to assist them as they constructed a new unistrut platform system to frame hot aisle containment (HAC) units within an existing Meta data center. 

Aligned Data Center Campus, Project Phoenix

Shippingport, Pennsylvania (2026 to Present)

In September 2026, Aligned Data Centers (Aligned) and Holder Construction (Holder) broke ground on a $10B+, 2-million square foot data center campus at the Port of Shippingport, where several data centers are under construction.

Texas Instruments Semiconductor Fabrication Plant (LFAB2)

Lehi, Utah (2025 - Present)

Stemming from the CHIPS Act passed by Congress to advance semiconductor manufacturing and research in the USA, Texas Instruments (TI) announced plans to invest $11B into Utah for this endeavor, making it the largest economic investment in Utah’s history. 

TSMC Phase 4 Auxiliary Buildings

Phoenix, Arizona, (2026 to Present)

Since 2021, the Taiwan Semiconductor Manufacturing Company (TSMC), the largest independent chipmaker in the world, has been building out fabrication facilities on its campus in Phoenix, Arizona.

Cottonwood Connections

Cottonwood Heights, Utah (2024 - 2025)

In an effort to improve water conveying throughout the Cottonwood Heights area, the Metropolitan Water District of Salt Lake & Sandy (MWDSLS) hired Hazen and Sawyer to design and engineer this project, which installs over 2,000 linear feet of new welded steel pipe.