Burbank, California (2024 - 2026)

Hollywood Burbank Airport Replacement Terminal Project

In 2024, OCI began providing the General Contractor, a joint venture between Holder Construction, Pankow Builders, and TEC (known as HPTJV) with quality control consulting services during the reconstruction of the Hollywood Burbank Airport (BUR). This project builds a completely new 355,000 square foot terminal with 14 gates, an Airport Support Facility, and a 7-story post-tensioned concrete parking garage that creates over 6,600 new parking spaces. This approximate $1.5B project is planned to open to the public by the end of 2026. The project team includes:

355,000

Square Foot

14

Gates

$1.5 B

Project Value

Hollywood Burbank Airport

OCI has deployed 3 full-time quality consultants to assist HPTJV and the project team as they observe ongoing construction activities. We identify quality and constructability issues during our shop drawing review or observation of construction activities. We then work with the project team to help bring these items to quick resolution and pass final inspections, which keeps the project on schedule and avoids costly rework. Our certified consultants assist in the following areas:
  • Reinforced Concrete
  • Post-Tensioned Concrete
  • Structural Steel
  • Metal Framing
  • Firestopping
  • Seismic Bracing