Salt Lake City International Airport Terminal Replacement Project : PHASE 3, 2022 – 2024

North Concourse East (Concourse B)

This concourse extends the existing Concourse B an additional 16 gates to the east. It will also connect to the Central Tunnel for easier passenger travel between Concourses A and B. A future Phase 4 of the project will extend this Concourse even further to the east.

Central Tunnel Buildout

While the structure of this 1,000-foot-long tunnel was built during Phase 2, the interior build-out occurs during Phase 3. This includes fire rated walls, seismic bracing for MEP trades, moving walkways, and interior finishes.