Salt Lake City International Airport Terminal Replacement Project : PHASE 2, 2021 – 2023

South Concourse East (Concourse A)

With the west half of Concourse A being complete during phase 1, this east portion adds an additional 20 gates and is over 1,500 feet in length. The structure also utilizes steel framing that is designed to the latest seismic requirements of the International Building Code.

Central Tunnel

This 1,000-foot-long tunnel will improve passenger transportation between Concourse A and Concourse B to the north. The tunnel is completely underground and waterproofed. It is constructed with reinforced concrete mat foundations, walls, and a suspended slab lid over thousands of driven H-piles.